I did some more mocking up this morning.
I’ve decided to go with the recommendation of two banks of four, side to side. Instead of 44” total width, I’m going to go with 42”, for some extra clearance for ducts and what not inside the tent.
I think wire management is going to be the toughest part. I want it to be somewhat professional. The OCD in me won’t allow wires everywhere and it’s got to be neat.
Here’s where Im at. I got a lot of ideas in my head on how to put this together in a way that Im happy with. I may need to make a run for some small parts.
View attachment 100589